La Poile Project

The La Poile Project comprises 700 Ha of  prospective mineral licenses in south central Newfoundland.

High-grade massive sulphide mineralization is hosted within a 1m thick horizon of up to 30% combined Zn-Pb-Cu-Ag contained within a thicker (up to 70 m) sequence of sulphide bearing biotite schist.

The mineralized zone has a strike length of ~2.9 km with depths up to 400 m and hosted within a west plunging syncline that provides attractive targets for structurally thickened mineralization.